An ESA notification of work and an electrical permit are the same filing. ESA calls it a notification of work “(or permit)”. Same paper, two names. The paper that really differs is the City’s building permit.
This isn’t a truck-today question. It’s a book-ahead one. Sort it out before anyone opens a wall.
Same paper, ESA’s word for it
Everyone else says permit. ESA says notification. The Ontario Electrical Safety Code requires almost all electrical work to be reported to ESA that way.
What does the filing do? Two things. It “creates a permanent record of the electrical work that has been done in your home”. And it “triggers a review process by ESA”.
The person doing the work files it. That’s you, or a Licensed Electrical Contractor. Never somebody in between. And it’s filed before the work starts.
The job doesn’t have to be big. Even little jobs need one. Adding a circuit for a level 1 EV charger? Ask who’s filing before anyone starts.
The paper that’s actually different: the City’s building permit
Here’s the one people really mean. The rule is plain: “Having a building permit isn’t the same as filing an electrical notification. You may need both.”
Two offices, two rulebooks. The City of Barrie’s building permit is checked against the Building Code. ESA’s side is the Ontario Electrical Safety Code. Neither one stands in for the other.
Which Barrie jobs carry both? The City publishes lists of common residential projects so you can check whether its permit is required. These ones have wiring in them:
| Job | City of Barrie building permit? |
|---|---|
| Add a basement suite | Yes |
| Finish a basement with a new bedroom | Yes |
| Solar panels on the roof | Yes, as a roof alteration |
| Enclosure around a hot tub | Yes |
| Garage or other outbuilding over 10m2 | Yes |
| Add air conditioning to an existing system | No |
| Replace the furnace, same fuel and capacity | No |
That column is the City’s answer, not ESA’s. The City’s own note says its lists aren’t exhaustive, so call Service Barrie on anything that’s close.
The basement suite is where the two overlap most. Our post on basement apartment electrical requirements in Barrie covers the electrical half of that job.
You file it, or your contractor does. Not both.
Can you take out the permit yourself? Homeowners may do electrical work in their own home, with a notification filed. Friends, family members and neighbours can’t do the work for you.
Paying someone for the job? The licensed shop files. Whoever does the work has to be the one who files. Not sure which side your job falls on? When do you need a licensed electrician is answered there in three questions.
Has a contractor asked you to file in your own name? Stop there. ESA calls that a red flag. They “could be unlicensed.”
What the filing starts, and what closes it
The notification opens the file. The inspection and the certificate close it.
- The notification. Filed before work starts.
- The inspection request. Made before anything is covered or buried. The work is inspected first.
- The review. It varies by job. The safety-risk evaluation can decide a visit isn’t needed.
- The defect notice, if any. It lists what has to be fixed to meet the code.
- The Certificate of Acceptance. ESA issues it to whoever filed the notification.
That last step is the one homeowners lose. If the contractor filed, the certificate goes to the contractor. Ask for a copy. Insurers and resale both lean on it.
When nobody filed
No notification, no inspection. No inspection, no Certificate of Acceptance. The work can look fine for years and still have no paper behind it.
When does that show up? Not the day the job’s done. It surfaces at a closing, when a buyer’s lawyer wants paper for the finished basement. It surfaces at an insurance renewal, when the insurer has flagged the wiring. Or it surfaces at the next owner’s inspection.
Is the quote with no filing cheaper? Only until then. A contractor who skips the notification isn’t saving you anything. They’re moving the bill to whoever sells the house.
The third filing: plan review
Some jobs add one more step. For certain installations, ESA won’t let the work start until the plans have been reviewed.
Will a house hit it? Rarely. The triggers are things like a three-phase service or standby generation of 400 amps or more. A bi-directional EV charger with an output over 12 kW is on the list too.
Plan review is also where the resubmission question comes from. ESA asks for one on a major change in scope. Changing the service size is its own example.
Three things to refuse
- A contractor who wants the notification in your name. That’s a red flag.
- A renovator who says the building permit covers the electrical. It doesn’t.
- A quote with no notification on it. It belongs on the quote as a line. What that line pays for is in our breakdown of ESA inspection cost across Ontario.
Where an inspection fits
Bought a house where nobody filed anything? What you can hire is a licensed contractor to inspect the existing installation and write it up. That’s the Barrie ESA inspection we sell, and it’s the starting point when an insurer or a buyer’s lawyer wants paper that doesn’t exist yet.
Not sure which papers your job needs? Call and describe it. We’ll say whether it needs an ESA notification, a City permit, or both, and roughly what it runs, before anyone books anything.
Before you book anyone for new work, including us, ask one thing. Who’s filing the notification, and in whose name?